Job |
Description |
| |
|
| |
Year 2004 |
| 2516 |
Engineering services, FEED and detailed design, Gabon |
| 2486 |
FPSO pipeline sizing, offshore Nigeria. |
| 2485 |
Gas lift study, offshore Nigeria. |
| 2471 |
Depressurisation study, UK North Sea. |
| 2470 |
SSIV assessment for offshore flowline, UK North Sea. |
| |
|
| |
Year 2003 |
| 2444 |
Definition engineering for an oil production facility for West Africa. |
| 2440 |
Water handling capacity study |
| 2434 |
Flare system upgrade study |
| 2413 |
Conceptual engineering for platform life extension |
| 2397 |
Technical and commercial services for an insurance claim following fire damage |
| 2380 |
Hazardous area assessment |
| |
|
| |
Year 2002 |
| 2376 |
Technical and commercial services for an insurance claim following fire damage. |
| 2371 |
Preparation of a technical report to assist dispute resolution for international gas supply |
| 2367 |
Export tie-in study for incremental production at an existing facility |
| 2364 |
Detail engineering for facilities upgrade |
| 2362 |
Crude export pump upgrade |
| 2357 |
Preparation of an expert report for a dispute involving pipeline blockage |
| 2354 |
SIL assessment support |
| 2344 |
Loss adjusting technical services for refinery operations |
| 2341 |
Technical and commercial services for an insurance claim following fire damage to an operating petrochemical complex |
| 2336 |
QRA update for new shift pattern |
| 2334 |
Safety critical system identification |
| 2305 |
Site surveys and preparation of as-built drawings for production facilities |
| 2304 |
Optimisation study for the depressurisation system on an offshore production facility |
| 2303 |
Design and operations review of a large number of existing production facilities |
| 2293 |
Assessment of damage caused by solvent fire at an operating ink manufacturing facility in Europe. |
| 2290 |
Engineering for the upgrade of crude oil production facilities in Kazakhstan |
| 2289 |
Preparation of operational safety case and performance standards for a gas production and processing facility in North Africa |
| 2287 |
Safety integrity level (SIL) analysis for the ventilation system of a railway tunnel on the Channel Rail Link |
| 2283 |
Study of changes to the entry specification of gas into a national gas supply system |
| 2281 |
Detailed design of the expansion of existing facilities for the introduction of additional production |
| |
|