Job |
Description |
| |
|
| |
Year 2005 |
| 2527 |
Conceptual engineering, Abu Dhabi |
| 2524 |
FPSO technical audit and general review. |
| 2523 |
Onsite process engineering services, UK |
| |
|
| |
Year 2004 |
| 2511 |
Oil loading pier design, Kuwait. |
| 2509 |
Gas export SSIV bypass risk assessment. |
| 2501 |
Engineering services, various stages of design. UK port jetty. |
| 2497 |
Water injection control system review. |
| |
|
| |
Year 2003 |
| 2446 |
Pre-shipment inspection |
| 2444 |
Definition engineering |
| 2443 |
Design for coiled tubing operations |
| 2440 |
Water handling capacity study |
| 2439 |
FEED and detail design |
| 2437 |
Engineering and technical services |
| 2434 |
Flare system upgrade study |
| 2432 |
Offshore CO2 removal feasibility study |
| 2421 |
Expert services |
| 2413 |
Conceptual engineering for platform life extension |
| 2407 |
FPSO cost survey |
| 2404 |
Cost estimation and project schedule |
| 2397 |
Technical services |
| 2394 |
Riser platform structural design |
| 2386 |
Pipeline cost estimation |
| 2382 |
Detail design for extended well test |
| 2380 |
Hazardous area assessment |
| |
|
| |
Year 2002 |
| 2376 |
Technical services, physical damage |
| 2368 |
Development options study |
| 2367 |
Export tie-in study |
| 2365 |
Facilities engineering support |
| 2364 |
Detail engineering for facilities upgrade |
| 2362 |
Crude export pump upgrade |
| 2358 |
Concept definition studies |
| 2354 |
SIL assessment support |
| 2347 |
PR Platform detailed engineering |
| 2346 |
Detailed engineering |
| 2344 |
Loss adjusting technical services |
| 2341 |
Fire damaged facility: technical and cost assessment |
| 2338 |
Topsides detail design |
| 2327 |
Design and safety review |
| 2305 |
As-built drawings: field visit, P&IDs, GAs |
| 2304 |
Blowdown optimisation study |
| 2303 |
Design review of production facilities |
| 2302 |
FCCU incident investigation |
| 2301 |
Development planning and cost estimation for two offshore fields |
| 2299 |
EPC scope of work preparation |
| 2298 |
Feasibility study for offshore production facilities |
| 2294 |
Relief system hydraulic analysis |
| 2293 |
Assessment of fire damaged solvent facility |
| 2290 |
Upgrade of well flowstations |
| 2287 |
Ventilation control system SIL analysis |
| 2285 |
Pipeline project services |
| 2283 |
H2S removal study |
| 2280 |
Metering feasibility document to BP Specification |
| |
|
|
|