Woodhill Frontier Limited
 
Cost estimation

Woodhill has developed its own proprietary cost estimation software. As well as providing costings for front-end and detailed design, we offer an integrated decommissioning cost estimation model. This model is supplied with details of the customer's asset portfolio pre-installed, ready for use.

The decommissioning model features the following:

  • unlimited assets in one model
  • five decommissioning specifications:
    • minimum legal requirement
    • SPAR with derogation
    • SPAR without derogation
    • user specified
    • total removal
  • built-in database, including:
    • marine equipment
    • capabilities
    • costs
  • calculated decommissioning procedure
  • procedure can be user adjusted
  • integrated cost estimation
  • built-in sensitivity capability
  • tabular and graphical output

Woodhill’s cost estimation models aim to provide:

  • consistent estimates for all assets
  • easy benchmarking
  • clear audit trail

 

Woodhill Frontier Limited. A Wood Group Company
A Wood Group Company.

Investor in People

ISO9001-2000

 
© Woodhill Frontier Ltd.
All Rights Reserved.
  Woodhill Frontier Limited, a Company Registered in Scotland, with the Registered Number SC247872 and having its Registered Office at John Wood House,Greenwell Road, East Tullos Industrial Estate, ABERDEEN, AB12 3AX, United Kingdom.